Valve box on completed filter drum
Showing the drain, and matala in the backround just like the other 2 mech. filters on the other side of the pond.
|
|
|
|
Filter pad chop job
I went through the back of my skimmer with a uniseal to hook 4" pipe to the skimmer. It butts up against the filter pad and I will most likely have to cut a 4" hole in the pad itself to avoid flow restriction. but I want to try it this way first. Its possible... no likely that with 5000 GPH through the skimmer that I will have to do without this pad altogether, thats is why I have that drum filter downstream. If the pad works though, I would much rather clean it every day than go without the extra filtration.
|
Hard wired at last!
Also with the installation of the last pump vault the electrictian was able to finish, no more extension cords! I have 4 20 amp curcuits, one for each pump and one for air pumps and the Ebara pump that will serve as my settlement tank drain. You can also see the remote thermometer I have in this vault to keep track of pump temp. So far its running about 5 to 10 F. degrees above outside air temp. at the top of the vault where the hottest air in the vault should be. |
|
|